Hauling Road Development – 1st Survey

Bumanik has been done some development activity to provide production operation through survey activity on hauling road plan from mine block to Jetty Plan (Exclusive Port), survey stockpile area plan, quarry location plan for construction mining infrastructure until mining redesign activity through optimize the calculation of resource to became reserve technically, economically and socially worth to be mined.

There are some places that needs to be surveyed at least 6 places, it’s started by doing some survey around Keuno and Cengkeh Block, it is block that has been decided to be measured and drilled in Bungintimbe, North Morowali. This survey was done for making some sampling data that done by doing drilling, followed by making Mine Plan Engineer to determine the mining feasibility around this area.

At the moment after conducting several surveys, then the surveyor went on to do a hauling road to open the forest area contained in the already recorded blocks after they do some survey road for doing the Jetty part. Hauling road itself is the mining roads are made to facilitate hauling activities from the mining front to stockyard or stock field or to waste dump. Mine entrance is influenced by equipment factors.

Jetty activity usually done alongside of a river for ensuring the possibilities the estuary wil be used as alternative access the entry of barges for transit ore to Bumanik Jetty Plan in Korolaa river.

Close Menu