Proudly, Bumanik has participated in a program given by the Ministry of Energy and Mineral Resources (ESDM) regarding the Implementation of Good Mining Practice for Mining Safety. With points of assessment and application from ESDM, Bumanik is now one of the Pilot Companies for the implementation of Good Mining Practice, especially for Nickel Ore Mining Companies in the IUP OP Category in the Central Sulawesi Province Region.
This program is implemented based on 4 Circular Letters from Director of Engineering and the Environment from ESDM which contains:
- Fulfillment of Mineral and Coal (Minerba) Mining Safety Data Reporting Obligations
- Filling in the Initial Form for the Implementation of Mining Safety Management Assessment Verification
- Performance Assessment Form Application of Good Mining Practice
- Mining Safety Management Assessment Verification 2021
With the second circular on the point above, out of 5,574 Mineral and Coal mining companies in Indonesia, only 1,340 companies responded to participate in filling out the initial administration of the assessment. With 414 companies submitting administrative requirements on time, selected 173 companies that meet the requirements of the initial mining safety assessment.
The Initial Assessment of Phase 1 is carried out based on list below.
No. | Description |
1 | Have Mining Safety Statistic for 2020 Less than or Equal to 70% |
2 | Have Consideration of Risk Management Documentation |
3 | Have Conducted and Reported the result Internal Audit of “Sistem Manajemen Keselamatan Pertambangan” (SMKP) Minerba for 2020 |
With the final result, only 30 mining companies with selected to proceed for Phase 2.
By completing the Phase 1 Assessment, Bumanik has also carried out the Phase 2 Assessment process which focuses on the Field Assessment started on July 13th, 2021, until July 16th, 2021 with the Assessment Team and Bumanik Team as follows.
Assessment Team
No. | Person in Charge | Position |
1 | Mr. Alles Sandra Tardelli | Mining Inspector ESDM Centre for Mining Safety |
2 | Mr. Mufti Wirawan, S.Psi, MKKK | Experts from the Universitas Indonesia |
Bumanik Team
No. | Person in Charge | Position |
1 | Mr. Alwansyah | Chief of Mining Technic (KTT) |
2 | Mr. Gunawan | Operation Manager |
3 | Mr. Budi Satrio | Operation Superintendent |
4 | Mr. Faisal | Health and Safety Environment Officer |
5 | Mr. Ayyub | Operational Responsible Person |
6 | Mr. Dani Saefulleh | Operational Responsible Person |
7 | Mr. Anang Makruf | Plant and Logistic Superintendent |
8 | Mr. Andika | Health and Safety Environment Officer |
9 | Mr. Sigit | Health and Safety Environment Officer |
The agenda for Phase 2 is as follows.
- Assessment Suitability Aspects of Planning and Risk Management
- Assessment Field Aspects for 11 Areas (Hauling Road, Stockpile, Dumping Area, Workshop, Harbor, Office, Mess, Clinic, Laboratory, and BCC Hoarding)
- Assessment Internal Audit SMKP Period 2020
- Closing and notify the result of Recommendation and Improvement Suggestions from Assessment Team and Expert Team
The results of the Phase 2 Assessment will be announced in September 2021, with the award recipient categories based on the “Kontrak Karya” (KK) Category, Perjanjian Karya Perusahaan Pertambangan Batubara (PKP2B) Category, and IUP OP Category. With zero accidents from the end of Phase 2 to September 2021 will also be the assessment of the final result reward.
We are also very grateful to Mrs. Lana Saria as the Director of Engineering and the Environment and the Chief Mining Inspector from ESDM who has carried out the Assessment and Improvement of Bumanik.
Our Documentations.